The shot list for the day |
For this shoot, we had a 1:30 pm until 9:30 pm time slot for the studio. We set out to film all of the prop setup shots we had left. We made a shot list of the shots we needed, in addition to the shots we could do if we got all of the prop setup shots done.
When we planned out the shots to do, we put them in order of framing and shot type. We did this because someone pointed out to us that we could save more time by doing this rather than changing the lighting setup each time, as it is easier and faster to change the set (considering that our sets are quite simple) than alter the lighting each time.
As a group, we felt that this shoot was one of the most productive ones. We completed everything on the shot list, including the extension shots, which meant we had less work to do on the Saturday shoot.
No comments:
Post a Comment