Welcome

Welcome to my A2 media coursework blog, my name is Alice Cahill (0130)
I'm working in A2 Production Group 1 with Gavin Fraser (0245), Mahalia John (0345) and Kayvon Nabijou (0610)
Within the sidebar of my blog you can access a live link to The Latymer Media Music Video Blog, the archive to all of my posts and the labels to the A2 Preliminary Task, A2 Research & Planning, A2 Construction and A2 Evaluation

Thank you for taking your time to look at my blog.

MUSIC VIDEO

^Our Music Video
some_text
^Our Digipack Album Cover (Top to bottom, left to right: inside back, inside front, back cover, front cover)

Our Website

^Click Image to go to Our Website in a New Tab

Tuesday 4 November 2014

Studio Schedule

Since a lot of the groups are using studio to film their videos and not everyone has the same free time during school times, a schedule had to be made to break down the times that the studio could be used by different groups.

The members of our group mostly had completely different free time to each other, which made scheduling for our group more difficult.

Group 1 (our group which is coloured in blue on the schedule) have some long time slots, especially at the weekend where we are all present (marked with a capital A for all), which we hope to shoot the majority of the footage using the performance setup with. The other slots are during school time, which can be beneficial to us, for example with the performance shots using confetti, we need people on the sides to throw the confetti, which would be more difficult for us to do during the weekend when no-one is around. During the school time slots we think that it will be better to film the shots using the empty set and the close ups. This is because the empty set has very little preparation time and the close ups can be shot without the whole group present (as it is only one band member in the shot at a time).




No comments:

Post a Comment